Roadway Project Experience

 
US 75, Allen, Dallas District:

Designed the traffic control in the ramp reversal at Bethany. Also designed the drainage system on the frontage road, calculated quantities, created construction schedule, and QA/QC subconsultant signing and pavement markings sheets.

President George Bush Turnpike Eastern Extension, Rowlett, TX:

On for the PS&E development of this 2.75 mile six lane tollway segment with two lane frontage roads, ramps, toll gantries, roadway and railroad bridges, and cross-drainage culverts. Provided construction engineering services and addressed contractor’s RFI and field changes to project

US 77, Ellis County, Dallas District: 

Designed MOT plan sheets to upgrade 2-lane road into a 4-lane roadway with dual left turn lane. The project consisted of three (3) bridges and several intersections between US 287 and SH 342.

SH 6 in Robertson County, Bryan District:

6 mile widening roadway including grading, structures, base and surface widening to four lane divided highway.

FM 2818 at FM 2154:

Design of an interchange with railroad grade separation structure.

Welsh Road at FM 2818, Bryan District:

Construction of Intersection widening facilities including grading, structures, traffic signals and pavement markings and markers.